The user may define subclasses of this class.
A project identification code may be specified, as well as the agency responsible for carrying out the work. A positioning system may have been used during the data collection phase. The type of system, the type of instrument or receiver, and the method of operation may be given. A list of stations may be specified, as well as general remarks.